For design practices

Sensory design, integrated with your project

We bring sound, scent and sensory design into the project alongside architecture, interiors and building services, inside your team and under your documentation. You get a zone plan, coordinated layouts and a written brief that tenders as one line, and a system commissioned on site.

Focusquiet, low speech intelligibility Collaborationenergy without adding to the floor Restorationlow level, slow, unhurried Arrivalthe one placemeant to be noticed DOTS: STRUCTURAL COLUMNS · GREY: CEILING GRID · NO ZONE BOUNDARY FOLLOWS EITHER
Illustrative zone plan. Zones follow the activity, not the ceiling grid or the partition line.

What your team receives

A design package for your floor

Send us a floor plan and tell us how the space will be used. From that we prepare a design package your team can review and coordinate within the wider project.

ZONE 01Focus, quiet ZONE 02Open desking ZONE 03Meeting rooms ZONE 04Café and social ZONE 05Wellness ZONE 06Circulation, arrival Loudspeaker Acoustic sensor Zone boundary, set by activity rather than by walls Illustrative only. Not a client floor plate.
Illustrative zone plan.
Zone plan. Your floor divided by what happens in each part of it, each zone with an intent, a content character and a target level.
Schematic layout. Speaker and sensor positions coordinated against your ceiling and services, with technical schematics for the client and the contractor. Acoustic data is processed into metadata for sound levels, frequency and events. It is not conversation recording.
Indicative cost. A cost for that floor covering design, content, platform, installation and commissioning.

We stay with your team through documentation, tender and commissioning.

With the installed Moodsonic system

Moodsonic Control: a floor plan with its zones, the soundscape playing in the selected zone, its level and its schedule
Moodsonic Control. Choose soundscapes, adjust levels and set schedules for individual zones through a central interface.
Moodsonic Insights: sound levels by zone on a floor plan, with one zone’s trend over the week
Moodsonic Insights. View sound levels, frequency information and trends across zones.

Inside your stages

What lands at each stage

The sensory brief belongs in your documentation. Here is what we deliver at each stage, and the one thing we need from you to do it.

01

Concept and schematic

Sensory intent set alongside your zoning: what each area should sound like and why.

More

This is the point at which sound can still influence zoning, ceiling strategy and services, before they are fixed.

What we need: a floor plan and a conversation. Nothing more.

02

Design development

Zone plans, speaker and sensor layouts, technical schematics and indicative costing.

More

Coordinated early against lighting, sprinklers, diffusers and exposed services, because that is where the clashes and omissions show up. Acoustic data is processed into metadata for sound levels, frequency and events. It is not conversation recording.

What we need: your reflected ceiling plan and services layout, and your acoustic consultant’s report if there is one.

03

Documentation and tender

A written sensory design brief inside your documentation set, and a scope that tenders as one separable line item.

More

Builders and quantity surveyors get something they can price without guessing, which is the difference between a line that survives value management and one that does not.

What we need: your issue programme, so the scope lands with the right package.

04

Construction and commissioning

Installation through the appointed AV or electrical contractor to our schematic. We commission on site.

More

A space behaves differently once the furniture, finishes and people are in it, which is why commissioning happens there and not from a specification sheet.

What we need: ceiling access, cable pathways, rack space, power and a network drop. Nothing outside a standard fitout.

05

Post-occupancy

Where a review is in scope, we come back, measure and adjust. Tuning after handover is remote, with no ceiling access.

More

Where the client wants it, we report outcomes they can use in their own reporting.

What we need: an introduction to whoever owns the space after you hand it over.

The central social space at NSW Teachers Federation, Federation House
NSW Teachers Federation, Surry Hills. Photography by Geyer Valmont.

Working with a design practice

Designed for the ceiling we were given

A 530 square metre heritage floor at Federation House, designed with Geyer Valmont. Exposed brick, columns and beams on every plane, and a floor planned deliberately with no dead ends.

The soundscape and the audio infrastructure were designed around the fabric the design retained: pendant loudspeakers where the ceiling is open, in-ceiling where there is a tile ceiling, zoned across the central social space, the wellness space, two work areas and the perimeter meeting rooms, and installed through ADM. The acoustic design worked with those surfaces rather than over them.

The NSW Teachers Federation project →

Working together

A separately priced specialist package

Valeo Technology brings soundscaping, scent and sensory design into the project alongside architecture, interiors and building services. CEO Marcus Rose leads the design on every engagement, and delivery draws on Moodsonic’s platform and specialist acoustic, AV and fitout partners.

One coordinated price. We price the soundscaping scope from the floor plan, covering design, content, platform, installation and commissioning. The proposal identifies the upfront cost, ongoing licence and any exclusions, so your team has a defined package to include in the tender.
Through your project team. The package is normally quoted through the appointed AV or installation partner, with their delivery scope and margin included. Where a partner has not been appointed, we can introduce installers suited to the project.
Clear responsibilities. We develop the soundscaping design and specification, coordinate with the project team, and commission the installed system against the agreed brief. Installation and ongoing support responsibilities are set out in the project scope.
Credits and publication. Project credits reflect each collaborator’s contribution. We agree project publicity, photography use and credits with your team before publication.

For the specification

Checkable against a published standard

WELL, by feature

For WELL v2 feature S06 Minimum Background Sound, we commission to 40 to 45 dBA across open work areas and 40 to 42 dBA in focus rooms, agreed with the project’s acoustic consultant, and provide a report covering the system, measured levels and commissioned result for the project’s WELL submission. We have commissioned and reported against S06 at GSK Melbourne, a WELL Platinum building, at GSK Bangkok and Taipei, and at SAP Melbourne.

AS/NZS 2107 and ISO 3382-3

AS/NZS 2107 publishes recommended ranges for background sound with a lower bound as well as an upper one, so a well-treated open plan can fail by being too quiet. ISO 3382-3 gives open plan a measurable outcome, distraction distance, which we measure before and after.

Biophilic design

Terrapin Bright Green’s 14 Patterns of Biophilic Design includes sound within Pattern 2, Non-Visual Connection with Nature, and recognises water through seeing, hearing and touching it in Pattern 5. Give sound a defined role alongside the layout, materials and acoustic treatment.

Browning, Ryan & Clancy (2014), Patterns 2 and 5.

Every figure, with its study and its limits →

Sound at the design stage

We read the published work of 96 Sydney architecture, interior design and fitout practices, roughly 250 pages, to understand how sound is described at the design stage.

We work with design teams, acoustic consultants and installation partners to bring soundscaping into the design conversation from the first plan.

Valeo Technology desk scan, August 2026.

Start anywhere

Send a plan from a live bid

Send a floor plan and we return a zone plan, schematics and indicative costing, typically within one to two weeks, at no cost and with no obligation. If you are earlier than that, the evidence and the cost case are published in full and you are welcome to use them in your own client conversations.

If you are the builder or the AV partner on the job, this page is yours →